Limitations
This tool is an indicative simulation. It is not a quotation, not a cost estimate, and not a substitute for professional studies.
What can change reality
- Scope changes during construction.
- Interruptions, delays, or life events.
- Late-stage stress (the finish is fragile).
- Local constraints we do not model (permits, supply, workforce).
Use the result to simplify early, protect continuity, and avoid late expansions.